Junlong Peng
- Construction group conflict under resource overlap: a game theory approach. Dans: Engineering, Construction and Architectural Management, v. 32, n. 1 (juillet 2023). (2023):
- Labor resource allocation under extremely short construction period based on the inverse optimization method. Dans: Engineering, Construction and Architectural Management, v. 31, n. 3 (décembre 2022). (2022):