-
Paulson, Boyd C. / Douglas, Sarah A. / Kalk, Anthony / Touran, Ali / Victor, Graeme A. (1983): Simulation and Analysis of Construction Operations. Dans: Journal of Technical Topics in Civil Engineering, v. 109, n. 2 (août 1983).
https://doi.org/10.1061/jtcedl.0000010
-
El-Bibay, Hossam / Paulson, Boyd C. (2008): Microcomputer/Videodisc System for Construction Education. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 6, n. 2 (novembre 2008).
https://doi.org/10.1111/j.1467-8667.1991.tb00184.x
-
Paulson, Boyd C. / Babar, Nadeem / Chua, Lai‐Heng / Froese, Thomas M. (1989): Simulating Construction Robot Agents and Their Knowledge Environment. Dans: Journal of Computing in Civil Engineering, v. 3, n. 4 (octobre 1989).
https://doi.org/10.1061/(asce)0887-3801(1989)3:4(303)
-
Kim, Keesoo / Paulson, Boyd C. (2003): Agent-Based Compensatory Negotiation Methodology to Facilitate Distributed Coordination of Project Schedule Changes. Dans: Journal of Computing in Civil Engineering, v. 17, n. 1 (janvier 2003).
https://doi.org/10.1061/(asce)0887-3801(2003)17:1(10)
-
Kang, Leen S. / Paulson, Boyd C. (2000): Information Classification for Civil Engineering Projects by Uniclass. Dans: Journal of Construction Engineering and Management, v. 126, n. 2 (mars 2000).
https://doi.org/10.1061/(asce)0733-9364(2000)126:2(158)
-
Paulson, Boyd C. / Fondahl, John W. (1983): Craft Jurisdiction Impact on Construction. Dans: Journal of Construction Engineering and Management, v. 109, n. 4 (décembre 1983).
https://doi.org/10.1061/(asce)0733-9364(1983)109:4(369)
-
Paulson, Boyd C. (1985): Automation and Robotics for Construction. Dans: Journal of Construction Engineering and Management, v. 111, n. 3 (septembre 1985).
https://doi.org/10.1061/(asce)0733-9364(1985)111:3(190)
-
Paulson, Boyd C. / Chan, Weng Tat / Koo, Charlie C. (1987): Construction Operations Simulation by Microcomputer. Dans: Journal of Construction Engineering and Management, v. 113, n. 2 (juin 1987).
https://doi.org/10.1061/(asce)0733-9364(1987)113:2(302)
-
Halpin, Daniel W. / Paulson, Boyd C. / Schub, Adolf / Willenbrock, Jack H. (1987): Construction Education and Research in Central Europe. Dans: Journal of Construction Engineering and Management, v. 113, n. 3 (septembre 1987).
https://doi.org/10.1061/(asce)0733-9364(1987)113:3(468)
-
Sanvido, Victor E. / Paulson, Boyd C. (1991): Site Analysis Using Controller‐Function Charts. Dans: Journal of Construction Engineering and Management, v. 117, n. 2 (juin 1991).
https://doi.org/10.1061/(asce)0733-9364(1991)117:2(226)
-
Sanvido, Victor E. / Paulson, Boyd C. (1992): Site‐Level Construction Information System. Dans: Journal of Construction Engineering and Management, v. 118, n. 4 (décembre 1992).
https://doi.org/10.1061/(asce)0733-9364(1992)118:4(701)
-
Furuya, Nobuaki / Yamaoka, Reizou / Paulson, Boyd C. (1994): Construction of Akashi‐Kaikyo Bridge West Anchorage. Dans: Journal of Construction Engineering and Management, v. 120, n. 2 (juin 1994).
https://doi.org/10.1061/(asce)0733-9364(1994)120:2(337)
-
Paulson, Boyd C. (1995): Computers and Construction—Midcareer Reflections. Dans: Journal of Construction Engineering and Management, v. 121, n. 2 (juin 1995).
https://doi.org/10.1061/(asce)0733-9364(1995)121:2(197)
-
Pregenzer, Laurie J. / Seppanen, Paul J. / Kunz, John C. / Paulson, Boyd C. (1999): Value-Added Assessment of Construction Plans. Dans: Journal of Construction Engineering and Management, v. 125, n. 4 (août 1999).
https://doi.org/10.1061/(asce)0733-9364(1999)125:4(242)
-
Kang, Leen S. / Paulson, Boyd C. (1998): Information Management to Integrate Cost and Schedule for Civil Engineering Projects. Dans: Journal of Construction Engineering and Management, v. 124, n. 5 (septembre 1998).
https://doi.org/10.1061/(asce)0733-9364(1998)124:5(381)
-
El-Bibany, Hossam / Paulson, Boyd C. (1994): Collaborative Knowledge-integration Systems: A Tool for AEC Design, Management, and Coordination. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 9, n. 1 (janvier 1994).
https://doi.org/10.1111/j.1467-8667.1994.tb00359.x
-
Froese, Thomas M. / Paulson, Boyd C. (1994): OPIS: An Object Model-Based Project Information System. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 9, n. 1 (janvier 1994).
https://doi.org/10.1111/j.1467-8667.1994.tb00358.x
-
El-Bibany, Hossam E. / Paulson, Boyd C. (1999): A Parametrics Architecture for Design, Management, and Coordination in a Collaborative AEC Environment. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 14, n. 1 (janvier 1999).
https://doi.org/10.1111/0885-9507.00125
-
Kang, Leen S. / Paulson, Boyd C. (1997): Adaptability of Information Classification Systems for Civil Works. Dans: Journal of Construction Engineering and Management, v. 123, n. 4 (décembre 1997).
https://doi.org/10.1061/(asce)0733-9364(1997)123:4(419)
-
Tatum, C. B. / Vorster, Michael / Klingler, Mac G. / Paulson, Boyd C. (2006): Systems Analysis of Technical Advancement in Earthmoving Equipment. Dans: Journal of Construction Engineering and Management, v. 132, n. 9 (septembre 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:9(976)