-
Heo, Chan / Park, Moonseo / Ahn, Changbum R. (2024): Potential AI-Driven Algorithmic Collusion and Influential Factors in Construction Bidding. Dans: Journal of Computing in Civil Engineering, v. 38, n. 4 (juillet 2024).
https://doi.org/10.1061/jccee5.cpeng-5683
-
Hyun, Hosang / Park, Moonseo / Lee, Dowan / Lee, Jeonghoon (2021): Tower Crane Location Optimization for Heavy Unit Lifting in High-Rise Modular Construction. Dans: Buildings, v. 11, n. 3 (27 février 2021).
https://doi.org/10.3390/buildings11030121
-
Song, Kwonsik / Kwon, Nahyun / Anderson, Kyle / Park, Moonseo / Lee, Hyun-Soo / Lee, SangHyun (2017): Predicting hourly energy consumption in buildings using occupancy-related characteristics of end-user groups. Dans: Energy and Buildings, v. 156 (décembre 2017).
https://doi.org/10.1016/j.enbuild.2017.09.060
-
Ahn, Joseph / Ji, Sae-Hyun / Ahn, Sung Jin / Park, Moonseo / Lee, Hyun-Soo / Kwon, Nahyun / Lee, Eul-Bum / Kim, Yonggu (2020): Performance evaluation of normalization-based CBR models for improving construction cost estimation. Dans: Automation in Construction, v. 119 (novembre 2020).
https://doi.org/10.1016/j.autcon.2020.103329
-
Moon, Hyosoo / Williams, Trefor P. / Lee, Hyun-Soo / Park, Moonseo (2020): Predicting project cost overrun levels in bidding stage using ensemble learning. Dans: Journal of Asian Architecture and Building Engineering, v. 19, n. 6 (juin 2020).
https://doi.org/10.1080/13467581.2020.1765171
-
Lee, Kwang-Pyo / Lee, Hyun-Soo / Park, Moonseo / Kim, Hyunsoo / Han, Sangwon (2014): A Real-time Location-based Construction Labor Safety Management System. Dans: Journal of Civil Engineering and Management, v. 20, n. 5 (octobre 2014).
https://doi.org/10.3846/13923730.2013.802728
-
Lee, Hyun-Soo / Lee, Kwang-Pyo / Park, Moonseo / Baek, Yunju / Lee, SangHyun (2012): RFID-Based Real-Time Locating System for Construction Safety Management. Dans: Journal of Computing in Civil Engineering, v. 26, n. 3 (mai 2012).
https://doi.org/10.1061/(asce)cp.1943-5487.0000144
-
Lee, SangHyun / Peña-Mora, Feniosky / Park, Moonseo (2006): Web-Enabled System Dynamics Model for Error and Change Management on Concurrent Design and Construction Projects. Dans: Journal of Computing in Civil Engineering, v. 20, n. 4 (juillet 2006).
https://doi.org/10.1061/(asce)0887-3801(2006)20:4(290)
-
Lee, Jeonghoon / Park, Moonseo / Lee, Hyun-Soo / Kim, TaeYoon / Kim, Sooyoung / Hyun, Hosang (2016): Workflow dependency approach for modular building construction manufacturing process using Dependency Structure Matrix (DSM). Dans: KSCE Journal of Civil Engineering, v. 21, n. 5 (août 2016).
https://doi.org/10.1007/s12205-016-1085-1
-
Park, Moonseo / Kim, Wooyoung / Yoon, Yousang / Nepal, Madhav Prasad (2010): Scheduling decisions and their dynamic consequences on construction performance. Dans: KSCE Journal of Civil Engineering, v. 14, n. 3 (mai 2010).
https://doi.org/10.1007/s12205-010-0251-0
-
Park, Moonseo / Lee, Kyung-won / Lee, Hyun-Soo / Jiayi, Pan / Yu, Jungho (2013): Ontology-based construction knowledge retrieval system. Dans: KSCE Journal of Civil Engineering, v. 17, n. 7 (octobre 2013).
https://doi.org/10.1007/s12205-013-1155-6
-
Na, Lim Jay / Ofori, George / Park, Moonseo (2006): Stimulating Construction Innovation in Singapore through the National System of Innovation. Dans: Journal of Construction Engineering and Management, v. 132, n. 10 (octobre 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:10(1069)
-
Park, Moonseo / Peña-Mora, Feniosky (2004): Reliability Buffering for Construction Projects. Dans: Journal of Construction Engineering and Management, v. 130, n. 5 (octobre 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:5(626)
-
Hwang, Sungjoo / Park, Moonseo / Lee, Hyun-Soo / Lee, SangHyun / Kim, Hyunsoo (2015): Postdisaster Interdependent Built Environment Recovery Efforts and the Effects of Governmental Plans: Case Analysis Using System Dynamics. Dans: Journal of Construction Engineering and Management, v. 141, n. 3 (mars 2015).
https://doi.org/10.1061/(asce)co.1943-7862.0000939
-
Lee, SangHyun / Peña-Mora, Feniosky / Park, Moonseo (2005): Quality and Change Management Model for Large Scale Concurrent Design and Construction Projects. Dans: Journal of Construction Engineering and Management, v. 131, n. 8 (août 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:8(890)
-
Lee, SangHyun / Peña-Mora, Feniosky / Park, Moonseo (2006): Reliability and Stability Buffering Approach: Focusing on the Issues of Errors and Changes in Concurrent Design and Construction Projects. Dans: Journal of Construction Engineering and Management, v. 132, n. 5 (mai 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:5(452)
-
Lee, Hyun-Soo / Shin, Jae-won / Park, Moonseo / Ryu, Han-Guk (2009): Probabilistic Duration Estimation Model for High-Rise Structural Work. Dans: Journal of Construction Engineering and Management, v. 135, n. 12 (décembre 2009).
https://doi.org/10.1061/(asce)co.1943-7862.0000105
-
Lee, Hyun-Soo / Seo, Joon-oh / Park, Moonseo / Ryu, Han-Guk / Kwon, Soon-seok (2009): Transaction-Cost-Based Selection of Appropriate General Contractor-Subcontractor Relationship Type. Dans: Journal of Construction Engineering and Management, v. 135, n. 11 (novembre 2009).
https://doi.org/10.1061/(asce)co.1943-7862.0000086
-
Park, Moonseo / Ji, Sae-Hyun / Lee, Hyun-Soo / Kim, Wooyoung (2009): Strategies for Design-Build in Korea Using System Dynamics Modeling. Dans: Journal of Construction Engineering and Management, v. 135, n. 11 (novembre 2009).
https://doi.org/10.1061/(asce)co.1943-7862.0000095
-
Kim, Hyunsoo / Lee, Hyun-Soo / Park, Moonseo / Ahn, Changbum R. / Hwang, Sungjoo (2015): Productivity Forecasting of Newly Added Workers Based on Time-Series Analysis and Site Learning. Dans: Journal of Construction Engineering and Management, v. 141, n. 9 (septembre 2015).
https://doi.org/10.1061/(asce)co.1943-7862.0001002
-
Son, Bo-Sik / Lee, Hyun-Soo / Park, Moonseo / Han, Dong-Yeob / Ahn, Joseph (2012): Quantity based active schematic estimating (Q-BASE) model. Dans: KSCE Journal of Civil Engineering, v. 17, n. 1 (mai 2012).
https://doi.org/10.1007/s12205-013-1056-8
-
Park, Sun-Ho / Lee, Hyun-Soo / Park, Moonseo / Kim, Sooyoung (2017): Simulation-based evaluation of bottleneck in a CBR protective facility. Dans: KSCE Journal of Civil Engineering, v. 22, n. 2 (juin 2017).
https://doi.org/10.1007/s12205-017-1332-0
-
Kim, Tae Wan / Lee, Hyun-Soo / Park, Moonseo / Yu, Jung-Ho (2010): Productivity management methodology using productivity achievement ratio. Dans: KSCE Journal of Civil Engineering, v. 15, n. 1 (décembre 2010).
https://doi.org/10.1007/s12205-011-0983-5
-
Park, Moonseo / Ahn, Chulhong / Lee, Hyunsoo / Yoon, Yousang (2012): System dynamics-based strategies to diffuse construction VE in the public sector. Dans: KSCE Journal of Civil Engineering, v. 16, n. 4 (avril 2012).
https://doi.org/10.1007/s12205-012-1226-0
-
Park, Moonseo / Kim, Woo-Young / Lee, Hyun-Soo / Han, Sangwon (2011): Supply chain management model for ready mixed concrete. Dans: Automation in Construction, v. 20, n. 1 (janvier 2011).
https://doi.org/10.1016/j.autcon.2010.07.005
-
Jung, Minhyuk / Park, Moonseo / Lee, Hyun-Soo / Kim, Hyunsoo (2016): Weather-Delay Simulation Model Based on Vertical Weather Profile for High-Rise Building Construction. Dans: Journal of Construction Engineering and Management, v. 142, n. 6 (juin 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001109
-
Peña-Mora, Feniosky / Han, Sangwon / Lee, SangHyun / Park, Moonseo (2008): Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach. Dans: Journal of Construction Engineering and Management, v. 134, n. 9 (septembre 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:9(701)
-
Chan, Swee Lean / Park, Moonseo (2005): Project cost estimation using principal component regression. Dans: Construction Management and Economics, v. 23, n. 3 (mars 2005).
https://doi.org/10.1080/01446190500039812