Hyung Keun Park
- Risk-integrated cash flow forecasting for overseas construction projects. Dans: KSCE Journal of Civil Engineering, v. 18, n. 4 (novembre 2013). (2013):
- Developing the preliminary cost estimate for the free-form building facade in conjunction with the panel optimization process. Dans: KSCE Journal of Civil Engineering, v. 19, n. 5 (février 2015). (2015):
- Unit modular in-fill construction method for high-rise buildings. Dans: KSCE Journal of Civil Engineering, v. 20, n. 4 (décembre 2014). (2014):
- A study on the algorithm of cash flow forecasting model in the planning stage of a construction project. Dans: KSCE Journal of Civil Engineering, v. 20, n. 6 (octobre 2015). (2015):
- A simulation approach for a periodic PCR buffer allocation strategy in organizational program management. Dans: Automation in Construction, v. 20, n. 8 (décembre 2011). (2011):