Majid Parchami Jalal
- A BIM-based construction claim management model for early identification and visualization of claims. Dans: Smart and Sustainable Built Environment, v. 10, n. 2 (juillet 2020). (2020):
- (2023): Risk Analysis in Implementing Building Energy Performance Projects: Hybrid DANP-VIKOR Model Analysis—A Case Study in Iran. Dans: Buildings, v. 13, n. 8 (2 août 2023).
- Contractual Risks of BIM Implementation and the Proposed Contract Form for DBB and DB Projects. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 1 (février 2023). (2023):
- Root Cause Analysis of the Most Frequent Claims in the Building Industry through the SCoP 3 E Ishikawa Diagram. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 11, n. 2 (mai 2019). (2019):
- Model for Preparing Optimal Contracts to Prevent or Reduce Claims in Projects. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 2 (mai 2020). (2020):
- Challenges of the Engineering Design Partnership Group in Design-Build Contracts. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 3 (août 2020). (2020):
- Integration of project management services for International Engineering, Procurement and Construction projects. Dans: Built Environment Project and Asset Management, v. 11, n. 2 (avril 2021). (2021):
- A hybrid SD-DEMATEL approach to develop a delay model for construction projects. Dans: Engineering, Construction and Architectural Management, v. 24, n. 4 (juillet 2017). (2017):
- 4D-BIM Dynamic Time–Space Conflict Detection and Quantification System for Building Construction Projects. Dans: Journal of Construction Engineering and Management, v. 144, n. 7 (juillet 2018). (2018):