Wei Pang
- Cyclic Loading Tests of Novel Precast Bridge Columns with Off-Site Post-Tensioned Tendons and On-Site Socket Connection. Dans: Journal of Earthquake Engineering. :
- Adopting Differential Lightning Protection Measures to Reduce Simultaneous Trip Probability of 220 kV Double-Circuit Transmission Line on the Same Tower. Dans: Journal of Physics: Conference Series, v. 2310, n. 1 (1 octobre 2022). (2022):