Jianshu Ouyang
- (2021): Study on the working performance of Wudongde Arch Dam during the first impounding period. Dans: IOP Conference Series: Earth and Environmental Science, v. 861, n. 6 (octobre 2021).
- Investigation of temperature rise after arch closure based on monitoring and numerical analysis: A case study of Baihetan arch dam. Dans: Case Studies in Construction Materials, v. 20 (juillet 2024). (2024):
- Application of distributed temperature sensing for cracking control of mass concrete. Dans: Construction and Building Materials, v. 197 (février 2019). (2019):