Abimbola Olukemi Windapo
- Development of a conceptual model for evaluating the success of BIM-based construction projects. Dans: Smart and Sustainable Built Environment, v. 10, n. 4 (juillet 2020). (2020):
- Understanding the gap between green building practice and legislation requirements in South Africa. Dans: Smart and Sustainable Built Environment, v. 4, n. 1 (mai 2015). (2015):
- Modelling the domino effect of advance payment system on project cash flow and organisational performance. Dans: Engineering, Construction and Architectural Management, v. 31, n. 13 (novembre 2023). (2023):
- Critical barriers to prevention through design in construction in Developing Countries: a qualitative inquiry. Dans: Engineering, Construction and Architectural Management, v. 30, n. 7 (mai 2022). (2022):
- Structural equation model of the barriers to preliminary and sustained BIM adoption in a developing country. Dans: Construction Innovation, v. 22, n. 4 (octobre 2021). (2021):
- Developing effective 4IR leadership framework for construction organisations. Dans: Engineering, Construction and Architectural Management, v. 28, n. 5 ( 2021). (2021):
- Mitigating Risks in African Construction Markets through the Interactive Behavior of Resources and Capabilities in Multinational Construction Companies and Entry Decisions. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 2 (mars 2017). (2017):
- Relationship between degree of risk, cost and level of compliance to occupational health and safety regulations in construction. Dans: Australasian Journal of Construction Economics and Building, v. 13, n. 2 (juin 2013). (2013):
- Value-based perspectives of stakeholders' building requirements in low cost and government subsidised housing projects in South Africa. Dans: Construction Innovation, v. 13, n. 4 (octobre 2013). (2013):