  1. Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1998): A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Dans: Engineering, Construction and Architectural Management, v. 5, n. 2 (février 1998).

    https://doi.org/10.1108/eb021072

  2. Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1998): A comparative evaluation of reinforcement fixing productivity rates amongst French, German and UK construction contractors. Dans: Engineering, Construction and Architectural Management, v. 5, n. 4 (avril 1998).

    https://doi.org/10.1108/eb021088

  3. Ahadzie, D. K. / Proverbs, D. G. / Olomolaiye, P. O. / Ankrah, N. A. (2009): Competencies required by project managers for housing construction in Ghana. Implications for CPD agenda. Dans: Engineering, Construction and Architectural Management, v. 16, n. 4 (juillet 2009).

    https://doi.org/10.1108/09699980910970842

  4. Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1998): A comparative evaluation of planning engineers' formwork productivity rates in European construction. Dans: Building and Environment, v. 33, n. 4 (juillet 1998).

    https://doi.org/10.1016/s0360-1323(97)00035-8

  5. Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1998): Factors impacting construction project duration: a comparison between France, Germany and the U.K.. Dans: Building and Environment, v. 34, n. 2 (mars 1998).

    https://doi.org/10.1016/s0360-1323(98)00004-3

  6. Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1998): A method for estimating labour requirements and costs for international construction projects at inception. Dans: Building and Environment, v. 34, n. 1 (janvier 1998).

    https://doi.org/10.1016/s0360-1323(97)00064-4

  7. Proverbs, D. G. / Olomolaiye, P. O. / Harris, F. C. (1996): An evaluation of transportation systems for high rise concrete construction. Dans: Building and Environment, v. 31, n. 4 (juillet 1996).

    https://doi.org/10.1016/0360-1323(96)00002-9

  8. Olomolaiye, P. O. / Price, A. D. F. (1989): A review of construction operative motivation. Dans: Building and Environment, v. 24, n. 3 (janvier 1989).

    https://doi.org/10.1016/0360-1323(89)90042-5

  9. Ogunlana, S. O. / Olomolaiye, P. O. (1989): A survey of site management practice on some selected sites in Nigeria. Dans: Building and Environment, v. 24, n. 2 (janvier 1989).

    https://doi.org/10.1016/0360-1323(89)90009-7

  10. Olomolaiye, P. O. / Ogunlana, S. O. (1988): A survey of construction operative motivation on selected sites in Nigeria. Dans: Building and Environment, v. 23, n. 3 (janvier 1988).

    https://doi.org/10.1016/0360-1323(88)90002-9

  11. Olomolaiye, P. O. / Wahab, K. A. / Price, A. D. F. (1987): Problems influencing craftsmen's productivity in Nigeria. Dans: Building and Environment, v. 22, n. 4 (janvier 1987).

    https://doi.org/10.1016/0360-1323(87)90024-2

  12. Kometa, S. T. / Olomolaiye, P. O. (1997): Evaluation of Factors Influencing Construction Clients' Decision to Build. Dans: Journal of Management in Engineering (ASCE), v. 13, n. 2 (mars 1997).

    https://doi.org/10.1061/(asce)0742-597x(1997)13:2(77)

  13. Olomolaiye, P. O. / Price, A. D. F. (1989): Construction operatives — Motivation and productivity. Great interdependence between motivation variables in construction operatives. Wrong to concentrate management action only on most important. Dans: Bâtiment International / Building Research and Practice, v. 17, n. 2 (mars 1989).

    https://doi.org/10.1080/01823328908726951

  14. Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1999): Factors in formwork selection: a comparative investigation. Dans: Building Research & Information, v. 27, n. 2 ( 1999).

    https://doi.org/10.1080/096132199369570

  15. Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1997): Factors influencing the choice of concrete supply methods. Dans: Building Research & Information, v. 25, n. 3 ( 1997).

    https://doi.org/10.1080/096132197370444

  16. Zhang, P. / Harris, F. C. / Olomolaiye, P. O. (1996): A computer‐based model for optimizing the location of a single tower crane. Authors claim 20–40% of hook horizontal travelling time can be saved if located at the position recommended by the model. Dans: Building Research & Information, v. 24, n. 2 ( 1996).

    https://doi.org/10.1080/09613219608727511

  17. Kaming, P. F. / Olomolaiye, P. O. / Corbett, P. / Harris, F. C. (1994): A framework for the strategic development of the construction industry in developing countries. Six strategic approaches to construction industry development in developing countries identified. Dans: Building Research & Information, v. 22, n. 6 ( 1994).

    https://doi.org/10.1080/09613219408727412

  18. O'Reilly, M. G. / Olomolaiye, P. O. / Tyler, A. H. / Orr, T. (1994): Issues of health and safety in the Irish construction industry. The frequencies of fatalities in the construction industry tends to be higher than almost any other sector of Irish industry save agriculture. The introduction of domestic legislation and European community legislation has improved the working environment but occupational accidents are still regarded as a major problem.. Dans: Building Research & Information, v. 22, n. 5 ( 1994).

    https://doi.org/10.1080/09613219408727397

  19. Holt, G. D. / Olomolaiye, P. O. / Harris, F. C. (1994): Incorporating project specific criteria and client utility into the evaluation of construction tenderers. Choice of contractor should be made on a value‐for‐money basis, rather than automatically accepting the lowest bid, the aim should be to accept the best tender. This paper helps selection contractors broaden their analysis. Dans: Building Research & Information, v. 22, n. 4 ( 1994).

    https://doi.org/10.1080/09613219408727384

  20. Harris, F. C. / Olomolaiye, P. O. (1993): A theoretical model for determining equipment service life. Quantitative method of determining the likely incidence of breakdowns over a period of usage of a piece of equipment while on the construction site as an aid to estimators, planners and site managers. Dans: Building Research & Information, v. 21, n. 4 ( 1993).

    https://doi.org/10.1080/09613219308727305

  21. Wijesundera, D. A. / Olomolaiye, P. O. / Harris, F. C. (1991): Dynamic simulation applied to materials handling in high-rise construction. Dans: Computers & Structures, v. 41, n. 6 (janvier 1991).

    https://doi.org/10.1016/0045-7949(91)90250-p

  22. Olomolaiye, P. O. / Harris, F. C. / Price, A. F. (1996): The sensitivity of bricklayers' output to changes in skill. Dans: Computers & Structures, v. 58, n. 2 (janvier 1996).

    https://doi.org/10.1016/0045-7949(95)00136-5

  23. Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1998): Scaffolding for high-rise concrete construction: A French, German and UK comparison. Dans: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 128, n. 1 (février 1998).

    https://doi.org/10.1680/istbu.1998.30035

  24. Zhang, P. / Harris, F. C. / Olomolaiye, P. O. / Holt, G. D. (1999): Location Optimization for a Group of Tower Cranes. Dans: Journal of Construction Engineering and Management, v. 125, n. 2 (mars 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:2(115)

  25. Ahadzie, D. K. / Proverbs, D. G. / Olomolaiye, P. O. (2008): Model for Predicting the Performance of Project Managers at the Construction Phase of Mass House Building Projects. Dans: Journal of Construction Engineering and Management, v. 134, n. 8 (août 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:8(618)

  26. Olomolaiye, P. O. / Ogunlana, S. O. (1989): An evaluation of production outputs in key building trades in Nigeria. Dans: Construction Management and Economics, v. 7, n. 1 (mars 1989).

    https://doi.org/10.1080/01446198900000008

  27. Olomolaiye, P. O. / Ogunlana, S. O. (1989): A system for monitoring and improving construction operative productivity in Nigeria. Dans: Construction Management and Economics, v. 7, n. 2 (juin 1989).

    https://doi.org/10.1080/01446198900000020

  28. Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1999): Productivity rates and construction methods for high rise concrete construction: a comparative evaluation of UK, German and French contractors. Dans: Construction Management and Economics, v. 17, n. 1 (janvier 1999).

    https://doi.org/10.1080/014461999371817

  29. Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1999): European construction contractors: a productivity appraisal of in situ concrete operations. Dans: Construction Management and Economics, v. 17, n. 2 (mars 1999).

    https://doi.org/10.1080/014461999371727

  30. Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1999): Construction resource/method factors influencing productivity for high rise concrete construction. Dans: Construction Management and Economics, v. 17, n. 5 (septembre 1999).

    https://doi.org/10.1080/014461999371196

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine