Jacek Olearczyk
- Decision support for hydraulic crane stabilization using combined loading and crane mat strength analysis. Dans: Automation in Construction, v. 131 (novembre 2021). (2021):
- Implementation of Combined Loading to Calculate Ground Bearing Pressure under Crawler Crane Tracks. Dans: Journal of Construction Engineering and Management, v. 147, n. 7 (juillet 2021). (2021):
- Automated rigging design for heavy industrial lifts. Dans: Automation in Construction, v. 112 (avril 2020). (2020):
- Evolution of the crane selection and on-site utilization process for modular construction multilifts. Dans: Automation in Construction, v. 43 (juillet 2014). (2014):
- Automating motion trajectory Of crane-lifted loads. Dans: Automation in Construction, v. 45 (septembre 2014). (2014):
- Automated Method for Checking Crane Paths for Heavy Lifts in Industrial Projects. Dans: Journal of Construction Engineering and Management, v. 139, n. 10 (octobre 2013). (2013):