Seisuke Okubo
- Real-Time Estimation Method for Tunnel-Excavated Rock Strength Based on TBM Parameters. Dans: International Journal of Geomechanics, v. 23, n. 7 (juillet 2023). (2023):
- Specific Energy Of A Hard-rock Tunneller And Rock Properties. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1998, n. 603 (septembre 1998). (1998):
- Loading Rate Dependency Of Sanjome Andesite And Tage Tuff In Uniaxial Tension. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 2003, n. 729 (mars 2003). (2003):
- Loading-rate Dependency Of Shear Strength Of Sanjome Andesite. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 2003, n. 743 (septembre 2003). (2003):
- 岩盤の時間依存性挙動と施工過程を考慮した掘削解析手法の提案 (Numerical Simulation Of Tunnel Excavation Considering Time Dependent Behaviour Of Rock Mass And The Effect Of Tunnel Support). Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 2005, n. 791 ( 2005). (2005):
- Applicability of the variable-compliance-type constitutive equation to rock breakage by excavation machinery. Dans: Tunnelling and Underground Space Technology, v. 26, n. 1 (janvier 2011). (2011):