- Incorporating Project Complexities in Risk Assessment: Case of an Airport Expansion Construction Project. Dans: Journal of Management in Engineering (ASCE), v. 38, n. 6 (novembre 2022). (2022):
- Scenario based evaluation of a cost risk model through sensitivity analysis. Dans: Engineering, Construction and Architectural Management, v. 22, n. 4 (juillet 2015). (2015):
- Judgmental risk analysis process development in construction projects. Dans: Building and Environment, v. 40, n. 9 (septembre 2005). (2005):
- Risk analysis in fixed-price design–build construction projects. Dans: Building and Environment, v. 39, n. 2 (février 2004). (2004):
- Comparison of Design Alternatives Based on Lifecycle Costing: Case of an Irrigation Project in Turkey. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 6 (novembre 2015). (2015):
- Risk assessment for determining best design alternative in a state-owned irrigation project in Turkey. Dans: KSCE Journal of Civil Engineering, v. 20, n. 1 (février 2015). (2015):
- Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model. Dans: Journal of Construction Engineering and Management, v. 134, n. 1 (janvier 2008). (2008):
- Construction cost analysis under uncertainty with correlated cost risk analysis model. Dans: Construction Management and Economics, v. 28, n. 2 (février 2010). (2010):