-
Demetracopoulou, Vassiliki / O'Brien, William J. / Khwaja, Nabeel / Feghaly, Jeffrey / El Asmar, Mounir (2022): A critical review and analysis of decision-support processes and tools for project delivery method selection. Dans: Engineering, Construction and Architectural Management, v. 31, n. 1 (septembre 2022).
https://doi.org/10.1108/ecam-05-2022-0455
-
Dharmapalan, Vineeth / O'Brien, William J. / Morrice, Douglas / Jung, Minhyuk (2021): Assessment of visibility in industrial construction projects: a viewpoint from supply chain stakeholders. Dans: Construction Innovation, v. 21, n. 4 (août 2021).
https://doi.org/10.1108/ci-07-2020-0114
-
France-Mensah, Jojo / O'Brien, William J. / Khwaja, Nabeel (2019): Impact of Multiple Highway Funding Categories and Project Eligibility Restrictions on Pavement Performance. Dans: Journal of Infrastructure Systems, v. 25, n. 1 (mars 2019).
https://doi.org/10.1061/(asce)is.1943-555x.0000458
-
France-Mensah, Jojo / Kothari, Chirag / O'Brien, William J. / Jiao, Junfeng (2019): Integrating social equity in highway maintenance and rehabilitation programming: A quantitative approach. Dans: Sustainable Cities and Society, v. 48 (juillet 2019).
https://doi.org/10.1016/j.scs.2019.101526
-
Dharmapalan, Vineeth / O'Brien, William J. (2018): Automated Materials Locating and Tracking Technology in Industrial Construction Projects: Implementation Benefits and Challenges. Dans: Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction, v. 171, n. 4 (décembre 2018).
https://doi.org/10.1680/jsmic.19.00009
-
France-Mensah, Jojo / Kothari, Chirag / O'Brien, William J. / Khwaja, Nabeel / Gonzalez, Ricardo (2019): Framework for Spatial-Temporal Cross-Functional Planning of Projects by Highway Agencies. Dans: Frontiers in Built Environment, v. 5 (novembre 2019).
https://doi.org/10.3389/fbuil.2019.00120
-
France-Mensah, Jojo / O'Brien, William J. (2019): Developing a Sustainable Pavement Management Plan: Tradeoffs in Road Condition, User Costs, and Greenhouse Gas Emissions. Dans: Journal of Management in Engineering (ASCE), v. 35, n. 3 (mai 2019).
https://doi.org/10.1061/(asce)me.1943-5479.0000686
-
Khwaja, Nabeel / O'Brien, William J. / Martinez, Mayra / Sankaran, Bharathwaj / O'Connor, James T. / Hale, William "Bill" (2018): Innovations in Project Delivery Method Selection Approach in the Texas Department of Transportation. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 6 (novembre 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000645
-
France-Mensah, Jojo / O'Brien, William J. (2018): Budget Allocation Models for Pavement Maintenance and Rehabilitation: Comparative Case Study. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 2 (mars 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000599
-
Kang, Youngcheol / O'Brien, William J. / O'Connor, James T. (2015): Information-Integration Maturity Model for the Capital Projects Industry. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 4 (juillet 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000274
-
Sohn, Taehong / Azambuja, Marcelo / O'Connor, James T. / O'Brien, William J. (2014): Empirical Study on the Key Drivers Affecting Durations for Right-of-Way Acquisition on Highway Projects. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 3 (mai 2014).
https://doi.org/10.1061/(asce)me.1943-5479.0000264
-
Liao, Pin-chao / O'Brien, William J. / Thomas, Stephen R. / Dai, Jiukun / Mulva, Stephen P. (2011): Factors Affecting Engineering Productivity. Dans: Journal of Management in Engineering (ASCE), v. 27, n. 4 (octobre 2011).
https://doi.org/10.1061/(asce)me.1943-5479.0000059
-
O'Brien, William J. (2000): Implementation Issues In Project Web Sites: A Practioner's Viewpoint. Dans: Journal of Management in Engineering (ASCE), v. 16, n. 3 (mai 2000).
https://doi.org/10.1061/(asce)0742-597x(2000)16:3(34)
-
Liao, Pin-chao / Thomas, Stephen R. / O'Brien, William J. / Dai, Jiukun / Mulva, Stephen P. / Kim, Inho (2012): Benchmarking Project Level Engineering Productivity/ Inžinerinės veiklos našumo lyginimas projektų lygmeniu. Dans: Journal of Civil Engineering and Management, v. 18, n. 2 (avril 2012).
https://doi.org/10.3846/13923730.2012.671284
-
O'Brien, William J. / Fischer, Martin A. (2000): Importance of Capacity Constraints to Construction Cost and Schedule. Dans: Journal of Construction Engineering and Management, v. 126, n. 5 (octobre 2000).
https://doi.org/10.1061/(asce)0733-9364(2000)126:5(366)
-
Distefano, Marc J. / O'Brien, William J. (2009): Comparative Analysis of Infrastructure Assessment Methodologies at the Small Unit Level. Dans: Journal of Construction Engineering and Management, v. 135, n. 2 (février 2009).
https://doi.org/10.1061/(asce)0733-9364(2009)135:2(96)
-
Chen, Hong-Long / O'Brien, William J. / Herbsman, Zohar J. (2005): Assessing the Accuracy of Cash Flow Models: The Significance of Payment Conditions. Dans: Journal of Construction Engineering and Management, v. 131, n. 6 (juin 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:6(669)
-
Sankaran, Bharathwaj / O'Brien, William J. (2018): Bayesian Second-Order Factor Model for Maturity Assessment of CIM Technologies and Practices at Highway Agencies. Dans: Journal of Construction Engineering and Management, v. 144, n. 4 (avril 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001460
-
El-Mashaleh, Mohammad / O'Brien, William J. / Minchin, R. Edward (2006): Firm Performance and Information Technology Utilization in the Construction Industry. Dans: Journal of Construction Engineering and Management, v. 132, n. 5 (mai 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:5(499)
-
Kang, Youngcheol / O'Brien, William J. / Thomas, Stephen / Chapman, Robert E. (2008): Impact of Information Technologies on Performance: Cross Study Comparison. Dans: Journal of Construction Engineering and Management, v. 134, n. 11 (novembre 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:11(852)
-
Sankaran, Bharathwaj / O'Brien, William J. (2018): Impact of CIM Technologies and Agency Policies on Performance for Highway Infrastructure Projects. Dans: Journal of Construction Engineering and Management, v. 144, n. 7 (juillet 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001484
-
Xue, Xiaolong / Shen, Qiping / Li, Heng / O'Brien, William J. / Ren, Zhaomin (2009): Improving agent-based negotiation efficiency in construction supply chains: A relative entropy method. Dans: Automation in Construction, v. 18, n. 7 (novembre 2009).
https://doi.org/10.1016/j.autcon.2009.05.002
-
Sankaran, Bharathwaj / Nevett, Guillermo / O'Brien, William J. / Goodrum, Paul M. / Johnson, Joshua (2018): Civil Integrated Management: Empirical study of digital practices in highway project delivery and asset management. Dans: Automation in Construction, v. 87 (mars 2018).
https://doi.org/10.1016/j.autcon.2017.12.006
-
Kang, Youngcheol / O'Brien, William J. / O'Connor, James T. (2012): Analysis of information integration benefit drivers and implementation hindrances. Dans: Automation in Construction, v. 22 (mars 2012).
https://doi.org/10.1016/j.autcon.2011.09.003
-
Mondragon Solis, Fernando A. / O'Brien, William J. (2014): Critical evaluation of cognitive analysis techniques for construction field management. Dans: Automation in Construction, v. 40 (avril 2014).
https://doi.org/10.1016/j.autcon.2013.12.012
-
O'Connor, James T. / O'Brien, William J. / Choi, Jin Ouk (2014): Critical Success Factors and Enablers for Optimum and Maximum Industrial Modularization. Dans: Journal of Construction Engineering and Management, v. 140, n. 6 (juin 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000842
-
O'Brien, William J. / Fischer, Martin A. / Jucker, James V. (1995): An economic view of project coordination. Dans: Construction Management and Economics, v. 13, n. 5 (septembre 1995).
https://doi.org/10.1080/01446199500000044
-
O'Connor, James T. / O'Brien, William J. / Choi, Jin Ouk (2016): Industrial Project Execution Planning: Modularization versus Stick-Built. Dans: Practice Periodical on Structural Design and Construction, v. 21, n. 1 (février 2016).
https://doi.org/10.1061/(asce)sc.1943-5576.0000270
-
O'Brien, William J. (2017): Fiatech: The Next Generation of the Capital Projects Technology Roadmap. Dans: Journal of Construction Engineering and Management, v. 143, n. 9 (septembre 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001369
-
Delgado Camacho, Daniel / Clayton, Patricia / O'Brien, William J. / Seepersad, Carolyn / Juenger, Maria / Ferron, Raissa / Salamone, Salvatore (2018): Applications of additive manufacturing in the construction industry – A forward-looking review. Dans: Automation in Construction, v. 89 (mai 2018).
https://doi.org/10.1016/j.autcon.2017.12.031