Duncan Nicholson
- The Southbank Place development: tunnel movement predictions and monitoring performance. Dans: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 177, n. 2 (avril 2024). (2024):
- Application of observational method at Crossrail Tottenham Court Road station, UK. Dans: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 167, n. 2 (avril 2014). (2014):
- Embodied energy evaluation for sections of the UK Channel Tunnel rail link. Dans: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 165, n. 2 (avril 2012). (2012):
- New observational method framework for embedded walls. Dans: Geotechnical Research, v. 5, n. 3 (septembre 2018). (2018):
- Carbon dioxide from earthworks: a bottom-up approach. Dans: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 164, n. 2 (mai 2011). (2011):
- Achieving more for less at Canary Wharf Crossrail station, London. Dans: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 165, n. 5 (mai 2012). (2012):
- Simulation of repository gas migration in a bentonite buffer. Dans: Proceedings of the Institution of Civil Engineers - Engineering and Computational Mechanics, v. 167, n. 1 (mars 2014). (2014):