David Neeve
- Booth Wood reservoir – a post tender update. Dans: Dams and Reservoirs, v. 26, n. 2 (août 2016). (2016):
- Wentwood tower and valve refurbishment. Dans: Dams and Reservoirs, v. 28, n. 3 (septembre 2018). (2018):
- Use of CFD for modelling spillway performance. Dans: Dams and Reservoirs, v. 28, n. 2 (juin 2018). (2018):