Verya Nasri
- 3D‐nonlinear finite element analysis of staged shield‐driven tunnel excavation with a focus on response of segmental tunnel lining. Dans: Geomechanics and Tunnelling, v. 16, n. 1 (février 2023). (2023):
- Use of BIM technology for optimization and virtual build of TBM tunnels. Dans: Geomechanics and Tunnelling, v. 15, n. 2 (avril 2022). (2022):
- New ACI 533 guide on general design and construction aspects of precast concrete tunnel segments. Dans: Geomechanics and Tunnelling, v. 12, n. 5 (octobre 2019). (2019):
- Interaction diagrams for design of hybrid fiber-reinforced tunnel segments. Dans: Materials and Structures, v. 51, n. 1 (février 2018). (2018):
- Analyse tridimensionnelle d'une structure portique-radier sur un sol non linéaire. Dans: Revue française de Génie civil, v. 1, n. 2 (janvier 1997). (1997):
- Éléments infinis dans les problèmes de consolidation. Dans: Revue française de Génie civil, v. 1, n. 4 (janvier 1997). (1997):
- Effect of Soil Consolidation on Space Frame-Raft-Soil Interaction. Dans: Journal of Structural Engineering (ASCE), v. 123, n. 11 (novembre 1997). (1997):
- Design and construction of the Second Avenue subway project in New York / Entwurf und Bau der Second Avenue Subway in New York. Dans: Geomechanics and Tunnelling, v. 6, n. 5 ( 2013). (2013):
- Tunnels et Stations de Second Avenue Subway à New York. Présenté pendant: AFTES - Journées techniques, Monaco, 2008. (2008):