Yuto Nakazato
- 365‐day sectional work zone schedule optimization for road networks considering economies of scale and user cost. Dans: Computer-Aided Civil and Infrastructure Engineering. :
- Optimal Repair Policies for Infrastructure Systems with Life Cycle Cost Minimization and Annual Cost Leveling. Dans: Journal of Infrastructure Systems, v. 29, n. 3 (septembre 2023). (2023):