Mohammad Nahangi
- Automated Model-Based Finding of 3D Objects in Cluttered Construction Point Cloud Models. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 32, n. 11 (octobre 2017). (2017):
- Multiobjective Optimization for Scaffolding Space Planning in Industrial Piping Construction Using Model-Based Simulation Programming. Dans: Journal of Computing in Civil Engineering, v. 34, n. 1 (janvier 2020). (2020):
- Monte Carlo simulation for tolerance analysis in prefabrication and offsite construction. Dans: Automation in Construction, v. 103 (juillet 2019). (2019):
- Optimum Assembly Planning for Modular Construction Components. Dans: Journal of Computing in Civil Engineering, v. 31, n. 1 (janvier 2017). (2017):
- Parallel Systems and Structural Frames Realignment Planning and Actuation Strategy. Dans: Journal of Computing in Civil Engineering, v. 30, n. 4 (juillet 2016). (2016):
- Automatic Realignment of Defective Assemblies Using an Inverse Kinematics Analogy. Dans: Journal of Computing in Civil Engineering, v. 30, n. 2 (mars 2016). (2016):
- Pipe radius estimation using Kinect range cameras. Dans: Automation in Construction, v. 99 (mars 2019). (2019):
- Managing risk in modular construction using dimensional and geometric tolerance strategies. Dans: Automation in Construction, v. 83 (novembre 2017). (2017):
- Skeleton-based discrepancy feedback for automated realignment of industrial assemblies. Dans: Automation in Construction, v. 61 (janvier 2016). (2016):
- Identifying poses of safe and productive masons using machine learning. Dans: Automation in Construction, v. 84 (décembre 2017). (2017):
- Pipe spool recognition in cluttered point clouds using a curvature-based shape descriptor. Dans: Automation in Construction, v. 71 (novembre 2016). (2016):
- Automated assembly discrepancy feedback using 3D imaging and forward kinematics. Dans: Automation in Construction, v. 56 (août 2015). (2015):
- Kinematics chain based dimensional variation analysis of construction assemblies using building information models and 3D point clouds. Dans: Automation in Construction, v. 75 (mars 2017). (2017):
- Automating measurement process to improve quality management for piping fabrication. Dans: Structures, v. 3 (août 2015). (2015):