Ali Mousaei
- Optimized variable resource allocation framework for scheduling of fast-track industrial construction projects. Dans: Automation in Construction, v. 158 (février 2024). (2024):
- Planning of Mobile Crane Walking Operations in Congested Industrial Construction Sites. Dans: Journal of Construction Engineering and Management, v. 149, n. 7 (juillet 2023). (2023):
- Optimizing Heavy Lift Plans for Industrial Construction Sites Using Dijkstra’s Algorithm. Dans: Journal of Construction Engineering and Management, v. 147, n. 11 (novembre 2021). (2021):
- BIM-based 4D mobile crane simulation and onsite operation management. Dans: Automation in Construction, v. 128 (août 2021). (2021):
- Optimized Mobile Crane Path Planning in Discretized Polar Space. Dans: Journal of Construction Engineering and Management, v. 147, n. 5 (mai 2021). (2021):
- Heavy mobile crane lift path planning in congested modular industrial plants using a robotics approach. Dans: Automation in Construction, v. 122 (février 2021). (2021):
- An A-Star algorithm for semi-optimization of crane location and configuration in modular construction. Dans: Automation in Construction, v. 121 (janvier 2021). (2021):
- Evaluating industrial modularization strategies: Local vs. overseas fabrication. Dans: Automation in Construction, v. 114 (juin 2020). (2020):