- Impact of Using a Formalized Methodology for Conflict Detection Based on 4D-BIM. Dans: Journal of Construction Engineering and Management, v. 150, n. 7 (juillet 2024). (2024):
- Formalizing the information requirements for decision-making of field managers during indoor construction activities. Dans: Engineering, Construction and Architectural Management. :
- (2022): Exploring Value Generation in Target Value Design Applying a Value Analysis Model. Dans: Buildings, v. 12, n. 7 (5 juillet 2022).
- (2021): Comparing Team Interactions in Traditional and BIM-Lean Design Management. Dans: Buildings, v. 11, n. 10 (22 septembre 2021).
- Analyzing the Association between Lean Design Management Practices and BIM Uses in the Design of Construction Projects. Dans: Journal of Construction Engineering and Management, v. 147, n. 4 (avril 2021). (2021):
- A new method for applying choosing by advantages (CBA) multicriteria decision to a large number of design alternatives. Dans: Energy and Buildings, v. 167 (mai 2018). (2018):
- Understanding Interactions between Design Team Members of Construction Projects Using Social Network Analysis. Dans: Journal of Construction Engineering and Management, v. 146, n. 6 (juin 2020). (2020):
- Modeling Virtual Design and Construction Implementation Strategies Considering Lean Management Impacts. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 32, n. 11 (octobre 2017). (2017):
- Performance Modeling for Contractor Selection. Dans: Journal of Management in Engineering (ASCE), v. 18, n. 2 (avril 2002). (2002):
- (2019): BIM Use Assessment (BUA) Tool for Characterizing the Application Levels of BIM Uses for the Planning and Design of Construction Projects. Dans: Advances in Civil Engineering, v. 2019 ( 2019).
- Impact of Machine-Failure Costs on Equipment Replacement Policies: Tunneling Company Case Study. Dans: Journal of Construction Engineering and Management, v. 138, n. 6 (juin 2012). (2012):
- Method to produce field instructions from product and process models for cast-in-place concrete operations. Dans: Automation in Construction, v. 22 (mars 2012). (2012):
- Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models. Dans: Automation in Construction, v. 17, n. 6 (août 2008). (2008):
- Criteria Used for Selecting Envelope Wall Systems in Chilean Residential Projects. Dans: Journal of Construction Engineering and Management, v. 141, n. 12 (décembre 2015). (2015):
- Industry Participation in Construction Capstone Courses: A Company's Experience. Dans: Practice Periodical on Structural Design and Construction, v. 19, n. 1 (février 2014). (2014):
- Multidisciplinary Design Optimization through process integration in the AEC industry: Strategies and challenges. Dans: Automation in Construction, v. 73 (janvier 2017). (2017):