Hiroshi Motoyama
- Evaluation Of Induced Stress By Earthquake In The Underground Structures Laid Throuth Different Ground Rigidity. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1990, n. 422 (octobre 1990). (1990):
- Effects Of Clearance Of Tail-void On The Load Of Segments In Shield Tunnel. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1991, n. 439 (décembre 1991). (1991):
- An Experimental Study On Shield Tunnel Londitudinal Rigidity And Its Behaviour During Earthquake With Watertight Membrane Installed Between Primary And Secondary Lining. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1993, n. 463 (mars 1993). (1993):
- A Study On Lining Design Of Earth Tunnels With Large Diameter Under High Water Pressure. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1996, n. 540 (juin 1996). (1996):
- Wave energy in surface layers for energy-based damage evaluation. Dans: Soil Dynamics and Earthquake Engineering, v. 27, n. 4 (avril 2007). (2007):