-
Moritz, Bernd / Themessl, Florian / Höhndorf, Markus / Helmberger, Albert (2024): Refurbishment of old railway tunnels using the Tauern Tunnel as an example. Dans: Geomechanics and Tunnelling, v. 17, n. 5 (octobre 2024).
https://doi.org/10.1002/geot.202400044
-
Matt, Robert / Moritz, Bernd / Parapatich, Thomas (2024): Challenges and new approaches for the inspection of railway tunnels – Asset safety management. Dans: Geomechanics and Tunnelling, v. 17, n. 5 (octobre 2024).
https://doi.org/10.1002/geot.202400048
-
Razgordanisharahi, Ali / Sorgner, Maximilian / Pilgerstorfer, Thomas / Moritz, Bernd / Hellmich, Christian / Pichler, Bernhard L. A. (2024): Realistic long-term stress levels in a deep segmented tunnel lining, from hereditary mechanics-informed evaluation of strain measurements. Dans: Tunnelling and Underground Space Technology, v. 145 (mars 2024).
https://doi.org/10.1016/j.tust.2024.105602
-
Jedlitschka, Gernot / Moritz, Bernd (2023): Internationale Großprojekte. Dans: Geomechanics and Tunnelling, v. 16, n. 2 (mars 2023).
https://doi.org/10.1002/geot.202370203
-
Boch, Ronny / Pilgerstorfer, Thomas / Moritz, Bernd (2022): Reduzierung von Versinterung durch optimierte Drainagebedingungen – Erkenntnisse eines Feldversuchs. Dans: Geomechanics and Tunnelling, v. 15, n. 4 (août 2022).
https://doi.org/10.1002/geot.202200011
-
Hellmich, Christian / Pichler, Bernhard / Heissenberger, Roman / Moritz, Bernd (2020): 150 years reliable railway tunnels – Extending the hybrid method for the long‐term safety assessment. Dans: Geomechanics and Tunnelling, v. 13, n. 5 (octobre 2020).
https://doi.org/10.1002/geot.202000023
-
Pilgerstorfer, Thomas / Hölzl, Harald / Moritz, Bernd (2020): Passing a major fault zone three times: NATM helps TBM to succeed. Dans: Geomechanics and Tunnelling, v. 13, n. 5 (octobre 2020).
https://doi.org/10.1002/geot.202000030
-
Richter, Helmut / Moritz, Bernd (2020): Geomechanik und Tunnelbau in einer außergewöhnlichen Situation. Dans: Geomechanics and Tunnelling, v. 13, n. 3 (juin 2020).
https://doi.org/10.1002/geot.202070303
-
Monsberger, Christoph M. / Lienhart, Werner / Moritz, Bernd (2018): In-situ assessment of strain behaviour inside tunnel linings using distributed fibre optic sensors. Beurteilung des In-situ-Dehnungsverhaltens der Tunnelschale mittels verteilter faseroptischer Messsysteme. Dans: Geomechanics and Tunnelling, v. 11, n. 6 (décembre 2018).
https://doi.org/10.1002/geot.201800050
-
Schubert, Peter / Moritz, Bernd (2019): Cross passages for segmental lined tunnels - structural analysis, test results and practical solutions. Dans: Geomechanics and Tunnelling, v. 12, n. 1 (février 2019).
https://doi.org/10.1002/geot.201970103
-
Atzl, Georg / Josmann, Gerd / Fleissner, Werner / Moritz, Bernd / Handke, Dieter / Zevnik, Jaka / Schiesser, Karl / Kiesling, Andreas (2019): Ground pressure-dependent segment opening options for cross passages on Koralm Tunnel contract KAT3 - Development of support types for cross passage excavation to segment-lined tunnel. Dans: Geomechanics and Tunnelling, v. 12, n. 1 (février 2019).
https://doi.org/10.1002/geot.201800063
-
Gschwandtner, Gunter G. / Kahn, Ursula / Kohlböck, Bernhard / Moritz, Bernd / Wagner, Stefan (2017): Granitztal tunnel chain - Experience from the construction of the Langer Berg Tunnel and challenges in the anhydrite zone. Dans: Geomechanics and Tunnelling, v. 10, n. 6 (novembre 2017).
https://doi.org/10.1002/geot.201700042
-
Hölzl, Harald / Pilgerstorfer, Thomas / Uschan, Robert / Wagner, Hanns / Moritz, Bernd (2017): Koralmtunnel underground emergency stop - Geotechnical design and construction. Dans: Geomechanics and Tunnelling, v. 10, n. 6 (novembre 2017).
https://doi.org/10.1002/geot.201700055
-
Moritz, Bernd / Pilgerstorfer, Thomas / Pointner, Peter (2017): Koralm Tunnel contract KAT3 - System behaviour in a geotechnically challenging environment. Dans: Geomechanics and Tunnelling, v. 10, n. 5 (octobre 2017).
https://doi.org/10.1002/geot.201700038
-
Barla, Giovanni / Moritz, Bernd (2017): Base tunnels. Dans: Geomechanics and Tunnelling, v. 10, n. 3 (juin 2017).
https://doi.org/10.1002/geot.201770303
-
Bauer, Johann / Kohlböck, Bernhard / Moritz, Bernd / Zwittnig, Gerald (2016): The Granitztal Tunnel Chain - State of works on the second longest tunnel system on the Koralmbahn / Tunnelkette Granitztal - Stand der Arbeiten für das zweitlängste Tunnelsystem an der Koralmbahn. Dans: Geomechanics and Tunnelling, v. 9, n. 5 ( 2016).
https://doi.org/10.1002/geot.201600041
-
Wilfing, Lisa / Käsling, Heiko / Goliasch, Robert / Moritz, Bernd / Thuro, Kurosch (2016): Penetration tests at the Koralm Tunnel (KAT2) - The right tool to improve penetration prediction in TBM tunneling? / Penetrationsversuche am Beispiel des Koralmtunnels (KAT2) - Ein Werkzeug zur Verbesserung von Penetrationsprognosen im maschinellen Tunnelbau?. Dans: Geomechanics and Tunnelling, v. 9, n. 3 ( 2016).
https://doi.org/10.1002/geot.201600005
-
Gehwolf, Paul / Monsberger, Christoph / Barwart, Stefan / Wenighofer, Robert / Galler, Robert / Lienhart, Werner / Haberler-Weber, Michaela / Moritz, Bernd / Barwart, Christian / Lange, Andreas (2016): Deformation measurements of tunnel segments at a newly developed test rig / Deformationsmessungen an Tübbingen mit einem neu entwickelten Prüfstand. Dans: Geomechanics and Tunnelling, v. 9, n. 3 ( 2016).
https://doi.org/10.1002/geot.201600012
-
Moritz, Bernd / Pilgerstorfer, Thomas / Pointner, Peter (2015): Experience of conventional excavation in crystalline rock mass on Koralm Tunnel contract KAT3 / Erfahrungen beim zyklischen Vortrieb im Kristallinabschnitt des Bauloses KAT3. Dans: Geomechanics and Tunnelling, v. 8, n. 6 ( 2015).
https://doi.org/10.1002/geot.201500040
-
Radončić, Nedim / Hein, Mario / Moritz, Bernd (2014): Determination of the system behaviour based on data analysis of a hard rock shield TBM / Analyse der Maschinenparameter zur Erfassung des Systemverhaltens beim Hartgesteins-Schildvortrieb. Dans: Geomechanics and Tunnelling, v. 7, n. 5 ( 2014).
https://doi.org/10.1002/geot.201400052
-
Radončić, Nedim / Hölzl, Harald / Moritz, Bernd / Bacher, Wolfgang (2013): Paierdorf ventilation facility - design and construction of a complex structure in challenging ground conditions / Das Lüftungsbauwerk Paierdorf - Planung und Herstellung eines komplexen Untertagebauwerks in anspruchsvollen Gebirgsverhältnissen. Dans: Geomechanics and Tunnelling, v. 6, n. 6 ( 2013).
https://doi.org/10.1002/geot.201310019
-
Moritz, Bernd / Radončić, Nedim / Helmberger, Albert / Uschan, Robert (2013): Construction shaft of the Koralm Tunnel lot KAT 2 - a challenge in structural analysis, geotechnics and logistics / Der Bauschacht des Koralmtunnels Baulos KAT 2 - eine statische, geotechnische und logistische Herausforderung. Dans: Geomechanics and Tunnelling, v. 6, n. 5 ( 2013).
https://doi.org/10.1002/geot.201300033
-
Moritz, Bernd / Wagner, Hanns / Mussger, Klaus / Handke, Dieter / Harer, Gerhard (2011): Criteria for the selection of tunnelling method through the example of the Koralm Tunnel / Kriterien zur Wahl der Vortriebsarten am Beispiel des Koralmtunnels. Dans: Geomechanics and Tunnelling, v. 4, n. 4 ( 2011).
https://doi.org/10.1002/geot.201100018
-
Moritz, Bernd / Koinig, Josef / Vavrovsky, Georg-M. (2011): Geotechnical safety management in tunnelling - an efficient way to prevent failure / Geotechnisches Sicherheitsmanagement im Tunnelbau - ein effizienter Weg zur Schadensvermeidung. Dans: Geomechanics and Tunnelling, v. 4, n. 5 ( 2011).
https://doi.org/10.1002/geot.201100029
-
Pilgerstorfer, Thomas / Radončić, N. / Moritz, Bernd / Goricki, Andreas (2011): Evaluation and interpretation of monitoring data in the test adit EKT Paierdorf / Auswertung und Interpretation der Messdaten aus dem Versuchsstollen EKT Paierdorf. Dans: Geomechanics and Tunnelling, v. 4, n. 5 ( 2011).
https://doi.org/10.1002/geot.201100036
-
Moritz, Bernd / Vergeiner, Ralf / Schubert, Peter (2002): Experience gained at monitoring of a shallow tunnel under a main railway line. Dans: Felsbau, v. 20, n. 2 ( 2002).
-
Brandtner, Markus / Moritz, Bernd / Schubert, Peter (2007): On the Challenge of Evaluating Stresses in a Shotcrete Lining - Experiences Gained in Applying the Hybrid Analysis Method. Dans: Felsbau, v. 25, n. 5 ( 2007).
-
Moritz, Bernd / Goldberger, Harald / Schubert, Peter (2006): Application of the Observational Method in Heterogeneous Rock Mass with Low Overburden. Dans: Felsbau, v. 24, n. 1 ( 2006).
-
Vigl, Alois / Moritz, Bernd / Sellner, Peter J. (2004): Paierdorf Exploration Shaft – Geotechnical Design, Safety Control and Site Quality Management. Dans: Felsbau, v. 22, n. 6 ( 2004).
-
Vigl, Alois / Moritz, Bernd / Sellner, Peter J. (2004): Paierdorf Exploration Shaft – Geotechnical Design, Safety Control and Site Quality Management. Dans: Felsbau, v. 22, n. 6 ( 2004).