Hyoun Seok Moon
- Development of a 4D object-based system for visualizing the risk information of construction projects. Dans: Automation in Construction, v. 31 (mai 2013). (2013):
- Development of methodology and virtual system for optimised simulation of road design data. Dans: Automation in Construction, v. 19, n. 8 (décembre 2010). (2010):
- Managing construction schedule by telepresence: Integration of site video feed with an active nD CAD simulation. Dans: Automation in Construction, v. 68 (août 2016). (2016):