Faizul Azli Mohd-Rahim
- Improving accuracy of conceptual cost estimation using MRA and ANFIS in Indonesian building projects. Dans: Built Environment Project and Asset Management, v. 8, n. 4 (septembre 2018). (2018):
- Fuzzy Mapping on Psychological Disorders in Construction Management. Dans: Journal of Construction Engineering and Management, v. 143, n. 2 (février 2017). (2017):
- Case Study of Facility Performance and User Requirements in the University of Malaya Research and Development Building. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 29, n. 5 (octobre 2015). (2015):
- Defects of Tensioned Membrane Structures in the Tropics. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 29, n. 2 (avril 2015). (2015):