Takayuki Minato
- A Risk Analysis Methodology For Corporate Management Options. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1995, n. 522 (septembre 1995). (1995):
- Assessment of risks in high rise building construction in Jakarta. Dans: Engineering, Construction and Architectural Management, v. 10, n. 1 (février 2003). (2003):
- A proactive approach for predicting recurrent defective designs. Dans: Building and Environment, v. 42, n. 9 (septembre 2007). (2007):
- Representing causal mechanism of defective designs: exploration through case studies. Dans: Construction Management and Economics, v. 22, n. 2 (février 2004). (2004):
- Representing causal mechanism of defective designs: a system approach considering human errors. Dans: Construction Management and Economics, v. 21, n. 3 (avril 2003). (2003):
- Data-Driven Analysis of "Corporate Risk" Using Historical Cost-Control Data. Dans: Journal of Construction Engineering and Management, v. 124, n. 1 (janvier 1998). (1998):