Eric Miller
- Multiobjective Approach to Long-Term Interurban Multilevel Road Network Planning. Dans: Journal of Transportation Engineering, v. 135, n. 9 (septembre 2009). (2009):
- Foamed concrete facilitates decommissioning of nuclear plant. Dans: Proceedings of the Institution of Civil Engineers - Energy, v. 166, n. 2 (mai 2013). (2013):
- Subway user behaviour when affected by incidents in Toronto (SUBWAIT) survey — A joint revealed preference and stated preference survey with a trip planner tool. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 45, n. 8 (août 2018). (2018):