Zhinan Mi
- Consecutive lifting and lowering electrohydraulic system for large size and heavy structure. Dans: Automation in Construction, v. 30 (mars 2013). (2013):
- An electrohydraulic system for synchronously jacked box tunneling in shallow saturated soft soil cover. Dans: Automation in Construction, v. 25 (août 2012). (2012):