Tingting Mei
- Reducing redundancy in large MEP building information models for facility management using oriented bounding boxes and hash sets. Dans: Automation in Construction, v. 165 (septembre 2024). (2024):
- Identifying Falling-from-Height Hazards in Building Information Models: A Voxelization-Based Method. Dans: Journal of Construction Engineering and Management, v. 148, n. 2 (février 2022). (2022):
- Rent-seeking behavior of BIM- and IPD-based construction project in China. Dans: Engineering, Construction and Architectural Management, v. 24, n. 3 (mai 2017). (2017):
- Labor crew workspace analysis for prefabricated assemblies’ installation. A 4D-BIM-based approach. Dans: Engineering, Construction and Architectural Management, v. 25, n. 3 (avril 2018). (2018):
- BIM Voxelization Method Supporting Cell-Based Creation of a Path-Planning Environment. Dans: Journal of Construction Engineering and Management, v. 146, n. 7 (juillet 2020). (2020):
- Cell-Based Transport Path Obstruction Detection Approach for 4D BIM Construction Planning. Dans: Journal of Construction Engineering and Management, v. 145, n. 3 (mars 2019). (2019):