Gang Mei
- Utilization of BIM in the Construction of a Submarine Tunnel: a Case Study in Xiamen City, China. Dans: Journal of Civil Engineering and Management, v. 27, n. 1 (8 janvier 2021). (2021):
- Model Predictive Control of Wind-Excited Building: Benchmark Study. Dans: Journal of Engineering Mechanics (ASCE), v. 130, n. 4 (avril 2004). (2004):
- Model Predictive Control of Structures under Earthquakes using Acceleration Feedback. Dans: Journal of Engineering Mechanics (ASCE), v. 128, n. 5 (mai 2002). (2002):
- Real-time model predictive control of structures under earthquakes. Dans: Earthquake Engineering and Structural Dynamics, v. 30, n. 7 (juillet 2001). (2001):
- Active health monitoring of an aircraft wing with an embedded piezoelectric sensor/actuator network: II. Wireless approaches. Dans: Smart Materials and Structures, v. 16, n. 4 (août 2007). (2007):
- Bridge Engineering in China. Dans: (2013): Handbook of International Bridge Engineering. CRC Press, Boca Raton (États-Unis), ISBN 978-1439810293. (2013):