0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Mohammed S. Hashem M. Mehany ORCID

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Garcia, Mary Valerie Angela Trinidad / Mehany, Mohammed S. Hashem M. / Abdelaty, Ahmed / Lucko, Gunnar (2025): A Comprehensive Categorization and Flowcharting for Schedule Delay Analysis Methods. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 17, n. 1 (février 2025).

    https://doi.org/10.1061/jladah.ladr-1159

  2. Mehany, Mohammed S. Hashem M. / Grigg, Neil (2015): Causes of Road and Bridge Construction Claims: Analysis of Colorado Department of Transportation Projects. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 7, n. 2 (mai 2015).

    https://doi.org/10.1061/(asce)la.1943-4170.0000162

  3. Mehany, Mohammed S. Hashem M. / Grigg, Neil (2016): Delay Claims in Road Construction: Best Practices for a Standard Delay Claims Management System. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 8, n. 3 (août 2016).

    https://doi.org/10.1061/(asce)la.1943-4170.0000186

  4. Marathe, Anuj / Mehany, Mohammed S. Hashem M. / Senior, Bolivar / Strong, Kelly (2017): Dispute Resolution and Contract Incentives: Perceptions of Project Stakeholders. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 4 (novembre 2017).

    https://doi.org/10.1061/(asce)la.1943-4170.0000243

  5. Mehany, Mohammed S. Hashem M. / Bashettiyavar, Gautham / Esmaeili, Behzad / Gad, Ghada (2018): Claims and Project Performance between Traditional and Alternative Project Delivery Methods. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 10, n. 3 (août 2018).

    https://doi.org/10.1061/(asce)la.1943-4170.0000266

  6. Mehany, Mohammed S. Hashem M. / Guggemos, Angela Acree (2016): Risk-Managed Lifecycle Costing for Asphalt Road Construction and Maintenance Projects under Performance-Based Contracts. Dans: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, v. 2, n. 4 (décembre 2016).

    https://doi.org/10.1061/ajrua6.0000888

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine