Yihua Mao
- Vision-based real-time progress tracking and productivity analysis of the concrete pouring process. Dans: Developments in the Built Environment, v. 21 (mars 2025). (2025):
- (2024): Safety Risk Prediction Model of High-Rise Building Construction Based on Key Physiological Index. Dans: Buildings, v. 14, n. 12 (18 décembre 2024).
- (2023): Investigating the Influence of Age-Friendly Community Infrastructure Facilities on the Health of the Elderly in China. Dans: Buildings, v. 13, n. 2 (14 février 2023).