Nirajan Mani
- Impact of Design Cost on Project Performance of Design-Bid-Build Road Projects. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 3 (mai 2014). (2014):
- Optimal Productivity in Labor-Intensive Construction Operations: Pilot Study. Dans: Journal of Construction Engineering and Management, v. 143, n. 3 (mars 2017). (2017):
- Estimating Construction Labor Productivity Frontier: Pilot Study. Dans: Journal of Construction Engineering and Management, v. 143, n. 10 (octobre 2017). (2017):
- Correlating the quantity and bid cost of unit price items for public road projects. Dans: KSCE Journal of Civil Engineering, v. 18, n. 6 (août 2014). (2014):
- Estimation of Optimal Productivity in Labor-Intensive Construction Operations: Advanced Study. Dans: Journal of Construction Engineering and Management, v. 144, n. 10 (octobre 2018). (2018):