Stephen Mak
- The construction of the Cross Bay Link bridge in Hong Kong. Dans: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 176, n. 3 (septembre 2023). (2023):
- Using Risk Analysis to Determine Construction Project Contingencies. Dans: Journal of Construction Engineering and Management, v. 126, n. 2 (mars 2000). (2000):
- A model of information management for construction using information technology. Dans: Automation in Construction, v. 10, n. 2 (janvier 2001). (2001):
- Using a real-time integrated communication system to monitor the progress and quality of construction works. Dans: Automation in Construction, v. 17, n. 6 (août 2008). (2008):
- Risk attitude and systematic bias in estimating and forecasting. Dans: Construction Management and Economics, v. 10, n. 4 (juillet 1992). (1992):
- The effect on contingency allowances of using risk analysis in capital cost estimating: a Hong Kong case study. Dans: Construction Management and Economics, v. 16, n. 6 (novembre 1998). (1998):