-
Ma, Zhiliang / Zhu, Honggang / Xiang, Xinglei / Turk, Ziga / Klinc, Robert (2024): Automatic compliance checking of BIM models against quality standards based on ontology technology. Dans: Automation in Construction, v. 166 (octobre 2024).
https://doi.org/10.1016/j.autcon.2024.105656
-
Gupchup, Jayant / Terzis, Andreas / Ma, Zhiliang / Priebe, Carey (2010): Classification-based event detection in ecological monitoring networks. Dans: Electronic Journal of Structural Engineering, n. 1 (juin 2010).
https://doi.org/10.56748/ejse.13001
-
Liu, Gang / Ma, Zhiliang / Li, Jiayi / Li, Songyang / Zhou, Xinhui / Song, Yinhao (2024): Framework of Digital Lean Construction and Implementation of Its Management Platform for the Construction Phase. Dans: Journal of Construction Engineering and Management, v. 150, n. 6 (juin 2024).
https://doi.org/10.1061/jcemd4.coeng-14164
-
Jiang, Can / Liang, Xiong / Zhou, Yu-cheng / Tian, Yong / Xu, Shengli / Lin, Jia-Rui / Ma, Zhiliang / Yang, Shiji / Zhou, Hao (2023): A multilayer perceptron-based fast sunlight assessment for the conceptual design of residential neighborhoods under Chinese policy. Dans: Building and Environment, v. 244 (octobre 2023).
https://doi.org/10.1016/j.buildenv.2023.110739
-
Jiang, Can / Li, Xin / Lin, Jia-Rui / Liu, Ming / Ma, Zhiliang (2023): Adaptive control of resource flow to optimize construction work and cash flow via online deep reinforcement learning. Dans: Automation in Construction, v. 150 (juin 2023).
https://doi.org/10.1016/j.autcon.2023.104817
-
Ma, Zhiliang / Liu, Yu / Li, Jiayi (2023): Review on automated quality inspection of precast concrete components. Dans: Automation in Construction, v. 150 (juin 2023).
https://doi.org/10.1016/j.autcon.2023.104828
-
Ma, Zhiliang / Liu, Zhe (2014): BIM-based Intelligent Acquisition of Construction Information for Cost Estimation of Building Projects. Dans: Procedia Engineering, v. 85 ( 2014).
https://doi.org/10.1016/j.proeng.2014.10.561
-
Yamada, Kentaro / Ma, Zhiliang / Okada, Takahiko / Shimada, Shizuo (1990): A Comprehensive Approach To Evaluating The Durability Of Water Supply Pipes Using Fuzzy Sets Theory. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1990, n. 416 (avril 1990).
https://doi.org/10.2208/jscej.1990.416_375
-
Ma, Zhiliang / Itoh, Yoshito (2000): A Web-centric System For Integrated Management And Utilization Of Lifecycle Information Of Road. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 2000, n. 665 (décembre 2000).
https://doi.org/10.2208/jscej.2000.665_177
-
Ma, Zhiliang / Li, Songyang / Wang, Yong / Yang, Zhenqing (2021): Component-level construction schedule optimization for hybrid concrete structures. Dans: Automation in Construction, v. 125 (mai 2021).
https://doi.org/10.1016/j.autcon.2021.103607
-
Li, Hong Xian / Ma, Zhiliang / Liu, Hexu / Wang, Jun / Al-Hussein, Mohamed / Mills, Anthony (2020): Exploring and verifying BIM-based energy simulation for building operations. Dans: Engineering, Construction and Architectural Management, v. 27, n. 8 ( 2020).
https://doi.org/10.1108/ecam-06-2019-0314
-
Ma, Zhiliang / Yamada, Kentaro (1993): Durability evaluation system of aged water supply pipes. Présenté pendant: IABSE Colloquium: Knowledge-Based Systems in Civil Engineering, Beijing, China, 1993.
https://doi.org/10.5169/seals-51867
-
Cai, Shiyao / Ma, Zhiliang / Skibniewski, Miroslaw J. / Guo, Jianfeng (2020): Construction Automation and Robotics: From One-Offs to Follow-Ups Based on Practices of Chinese Construction Companies. Dans: Journal of Construction Engineering and Management, v. 146, n. 10 (octobre 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001910
-
Cai, Shiyao / Ma, Zhiliang / Skibniewski, Miroslaw J. / Bao, Song / Wang, Heqin (2020): Construction Automation and Robotics for High-Rise Buildings: Development Priorities and Key Challenges. Dans: Journal of Construction Engineering and Management, v. 146, n. 8 (août 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001891
-
Ma, Zhiliang / Liu, Zhe / Wei, Zhenhua (2016): Formalized Representation of Specifications for Construction Cost Estimation by Using Ontology. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 31, n. 1 (décembre 2016).
https://doi.org/10.1111/mice.12175
-
Ma, Zhiliang / Ren, Yuan / Xiang, Xinglei / Turk, Ziga (2020): Data-driven decision-making for equipment maintenance. Dans: Automation in Construction, v. 112 (avril 2020).
https://doi.org/10.1016/j.autcon.2020.103103
-
Ma, Zhiliang (2012): A BIM-based approach to reusing construction firm's management information. Dans: Australasian Journal of Construction Economics and Building, v. 12, n. 4 (octobre 2012).
https://doi.org/10.5130/ajceb.v12i4.3033
-
Ma, Zhiliang / Ma, Jiankun (2016): Formulating the application functional requirements of a BIM-based collaboration platform to support IPD projects. Dans: KSCE Journal of Civil Engineering, v. 21, n. 6 (décembre 2016).
https://doi.org/10.1007/s12205-017-0875-4
-
Ma, Jiankun / Ma, Zhiliang / Li, Jiulin (2017): An IPD-based incentive mechanism to eliminate change orders in construction projects in China. Dans: KSCE Journal of Civil Engineering, v. 21, n. 7 (mai 2017).
https://doi.org/10.1007/s12205-017-0957-3
-
Ma, Zhiliang / Wei, Zhenhua / Zhang, Xiude (2013): Semi-automatic and specification-compliant cost estimation for tendering of building projects based on IFC data of design model. Dans: Automation in Construction, v. 30 (mars 2013).
https://doi.org/10.1016/j.autcon.2012.11.020
-
Ma, Zhiliang / Zhang, Dongdong / Li, Jiulin (2018): A dedicated collaboration platform for Integrated Project Delivery. Dans: Automation in Construction, v. 86 (février 2018).
https://doi.org/10.1016/j.autcon.2017.10.024
-
Yang, Zhitian / Ma, Zhiliang / Wu, Song (2016): Optimized flowshop scheduling of multiple production lines for precast production. Dans: Automation in Construction, v. 72 (décembre 2016).
https://doi.org/10.1016/j.autcon.2016.08.021
-
Ma, Zhiliang / Liu, Zhe (2018): Ontology- and freeware-based platform for rapid development of BIM applications with reasoning support. Dans: Automation in Construction, v. 90 (juin 2018).
https://doi.org/10.1016/j.autcon.2018.02.004
-
Ma, Zhiliang / Cai, Shiyao / Mao, Na / Yang, Qiliang / Feng, Junguo / Wang, Pengyi (2018): Construction quality management based on a collaborative system using BIM and indoor positioning. Dans: Automation in Construction, v. 92 (août 2018).
https://doi.org/10.1016/j.autcon.2018.03.027
-
Ma, Zhiliang / Yang, Zhitian / Liu, Shilong / Wu, Song (2018): Optimized rescheduling of multiple production lines for flowshop production of reinforced precast concrete components. Dans: Automation in Construction, v. 95 (novembre 2018).
https://doi.org/10.1016/j.autcon.2018.08.002
-
Li, Heng / Ma, Zhiliang / Shen, Qiping / Kong, Stephen (2003): Virtual experiment of innovative construction operations. Dans: Automation in Construction, v. 12, n. 5 (septembre 2003).
https://doi.org/10.1016/s0926-5805(03)00019-0