H. B. Luo
- Research on the computational model for carbon emissions in building construction stage based on BIM. Dans: Structural Survey, v. 30, n. 5 (novembre 2012). (2012):
- Using nD technology to develop an integrated construction management system for city rail transit construction. Dans: Automation in Construction, v. 21 (janvier 2012). (2012):
- A multi-attribute model for construction site layout using intuitionistic fuzzy logic. Dans: Automation in Construction, v. 72 (décembre 2016). (2016):
- Ontology-based semantic modeling of regulation constraint for automated construction quality compliance checking. Dans: Automation in Construction, v. 28 (décembre 2012). (2012):
- Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the internet of things. Dans: Automation in Construction, v. 36 (décembre 2013). (2013):
- An ontological approach for technical plan definition and verification in construction. Dans: Automation in Construction, v. 55 (juillet 2015). (2015):