P. J. Lowther
- Two 2500t Lifting Operations to Facilitate Fabrication of the Module Support Frames for the Brae 'A' Platform. Dans: Proceedings of the Institution of Civil Engineers, v. 74, n. 4 (novembre 1983). (1983):
- The Design, Construction and Use of Two 1800t-Capacity Jacking Towers. Dans: Proceedings of the Institution of Civil Engineers, v. 68, n. 2 (mai 1980). (1980):