- Analysis of the mitigating effect of post-grouting on the prestress loss of anchorage system. Dans: Construction and Building Materials, v. 451 (novembre 2024). (2024):
- Long-term mechanical performance analysis of post-grouting prestressed resin bolt under anchorage creep. Dans: Tunnelling and Underground Space Technology, v. 149 (juillet 2024). (2024):
- Axial compression tests of grouted connections in jacket and monopile offshore wind turbine structures. Dans: Engineering Structures, v. 196 (octobre 2019). (2019):
- Fatigue evaluation of grouted connections under bending moment in offshore wind turbines based on ABAQUS scripting interface. Dans: International Journal of Steel Structures, v. 16, n. 4 ( 2016). (2016):
- Experimental study on grouted connections under static lateral loading with various axial load ratios. Dans: Engineering Structures, v. 176 (décembre 2018). (2018):
- Fatigue bending test on grouted connections for monopile offshore wind turbines. Dans: Marine Structures, v. 60 (juillet 2018). (2018):