Johannes Linortner
- Structural design measures for a 93 m high concrete-faced rockfill dam (CFRD) to cope with difficult geological conditions / Planung und Errichtung eines 93 m hohen Steinschüttdamms unter schwierigen geologischen Bedingungen. Dans: Geomechanics and Tunnelling, v. 5, n. 5 ( 2012). (2012):
- Hydropowerplant Ermenek – Arch Dam Construction. Dans: Felsbau, v. 25, n. 5 ( 2007). (2007):
- Design and construction of the grout curtain for the Ermenek hydropower plant / Planung und Ausführung des Dichtschirms für das Wasserkraftwerk Ermenek. Dans: Geomechanics and Tunnelling, v. 2, n. 5 ( 2009). (2009):
- Ermenek HPP - groundwater table development during impounding. Dans: Geomechanics and Tunnelling, v. 3, n. 5 ( 2010). (2010):