Zhiyu Lin
- Analysis of the influence of the thickness insufficiency in secondary lining on the mechanical properties of Double-layer lining of shield tunnel. Dans: Engineering Failure Analysis, v. 141 (novembre 2022). (2022):
- (2024): Flow Pattern and Escape Hazards of People from Flood Intrusion into the Staircase of Underground Spaces with Multiple Rest Platforms. Dans: Buildings, v. 14, n. 4 (27 mars 2024).
- Research and evaluation on Water-dispersion resistance of synchronous grouting slurry in shield tunnel. Dans: Tunnelling and Underground Space Technology, v. 129 (novembre 2022). (2022):
- (2022): Numerical Simulation of Flood Intrusion Process under Malfunction of Flood Retaining Facilities in Complex Subway Stations. Dans: Buildings, v. 12, n. 6 (7 juin 2022).