Yunhong Lin
- (2024): Key Technologies for One-Time Installation of Super-Long Pipe Sheds in Tunnel Support Construction: A Case Study on Songhuai Youyuan Station (Line 9) in Zhengzhou Metro. Dans: Buildings, v. 14, n. 7 (2 juillet 2024).
- (2024): Analysis of Soil Differences in Subway Vibration Transmission Paths. Dans: Buildings, v. 14, n. 5 (24 avril 2024).
- The performance of construction waste backfilling subway depot—A case study in Zhengzhou. Dans: Case Studies in Construction Materials, v. 18 (juillet 2023). (2023):