Ming Lin
- Artificial Island Construction Using Large Steel Cylinders. Dans: Structural Engineering International, v. 30, n. 4 (octobre 2020). (2020):
- Memory bearing: A novel solution to protect element joints from differential settlement for immersed tunnels with deep alignment. Dans: Tunnelling and Underground Space Technology, v. 88 (juin 2019). (2019):
- deployable element, a new closure joint construction method for immersed tunnel. Dans: Tunnelling and Underground Space Technology, v. 80 (octobre 2018). (2018):
- The rationality of semi-rigid immersed tunnel element structure scheme and its first application in Hong Kong Zhuhai Macao bridge project. Dans: Tunnelling and Underground Space Technology, v. 82 (décembre 2018). (2018):