Fangzhou Lin
- Automated reality capture for indoor inspection using BIM and a multi-sensor quadruped robot. Dans: Automation in Construction, v. 170 (février 2025). (2025):
- Scheduling optimization of electric ready mixed concrete vehicles using an improved model-based reinforcement learning. Dans: Automation in Construction, v. 160 (avril 2024). (2024):
- Vision-based trajectory monitoring for assembly alignment of precast concrete bridge components. Dans: Automation in Construction, v. 140 (août 2022). (2022):