- Time lag between visual attention and brain activity in construction fall hazard recognition. Dans: Automation in Construction, v. 168 (décembre 2024). (2024):
- Toward an Intuitive Device for Construction Hazard Recognition Management: Eye Fixation–Related Potentials in Reinvestigation of Hazard Recognition Performance Prediction. Dans: Journal of Construction Engineering and Management, v. 150, n. 5 (mai 2024). (2024):
- Weighing Votes in Human–Machine Collaboration for Hazard Recognition: Inferring a Hazard-Based Perceptual Threshold and Decision Confidence from Electroencephalogram Wavelets. Dans: Journal of Construction Engineering and Management, v. 149, n. 9 (septembre 2023). (2023):
- Re-investigation of the Mediating Effect of Brain Activities between Dispositional Factors and Hazard Recognition: A Multilevel Logistic Regression Approach. Dans: KSCE Journal of Civil Engineering, v. 27, n. 9 (juin 2023). (2023):
- Visual attention and cognitive process in construction hazard recognition: Study of fixation-related potential. Dans: Automation in Construction, v. 148 (avril 2023). (2023):
- Risk-Based Metanetwork Modeling for Sustainable Project Performance in International Construction. Dans: Journal of Infrastructure Systems, v. 27, n. 3 (septembre 2021). (2021):
- Rethinking Risk Propagation Mechanism in Public–Private Partnership Projects: Network Perspective. Dans: Journal of Infrastructure Systems, v. 26, n. 2 (juin 2020). (2020):
- Probabilistic-Based Cascading Failure Approach to Assessing Workplace Hazards Affecting Human Error. Dans: Journal of Management in Engineering (ASCE), v. 35, n. 3 (mai 2019). (2019):
- Real-time Safety Inspection and Planning: A First Application of the Fagan Nomogram. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 47, n. 4 (avril 2020). (2020):
- A System Dynamics Model of Prevention through Design towards Eliminating Human Error. Dans: KSCE Journal of Civil Engineering, v. 23, n. 5 (mars 2019). (2019):
- The relationship between communication and construction safety climate in China. Dans: KSCE Journal of Civil Engineering, v. 18, n. 4 (novembre 2013). (2013):
- A special Partial Least Squares (PLS) path decision modeling for bid evaluation of large construction projects. Dans: KSCE Journal of Civil Engineering, v. 21, n. 3 (mai 2016). (2016):
- Selection of the approach for producing a weighting scheme for the CSR evaluation framework. Dans: KSCE Journal of Civil Engineering, v. 19, n. 6 (décembre 2014). (2014):
- Spatial–temporal Interrelationships of Safety Risks with Dynamic Partition Analysis: A Mechanical Installation Case. Dans: KSCE Journal of Civil Engineering, v. 22, n. 5 (août 2017). (2017):
- Work paradigm as a moderator between cognitive factors and behaviors – A comparison of mechanical and rebar workers. Dans: KSCE Journal of Civil Engineering, v. 21, n. 7 (mai 2017). (2017):