Xuewei Li
- (2024): Enhancing Building Information Modeling on Green Building Practices in China: A Conceptual Framework. Dans: Buildings, v. 14, n. 6 (19 juin 2024).
- Risk Assessment of Subway Station Fire By Using a Bayesian Network-Based Scenario Evolution Model. Dans: Journal of Civil Engineering and Management, v. 30, n. 3 (12 mars 2024). (2024):
- The effects of joint-contract functions on PPP project value creation: a mediation model. Dans: Engineering, Construction and Architectural Management. :
- Mechanochemical Activation of Antigorite to Provide Magnesium and Hydroxide Ions for Recovering Phosphorus and Nitrogen from Wastewater as Struvite. Dans: Journal of Environmental Engineering (ASCE), v. 149, n. 7 (juillet 2023). (2023):
- BIM-enabled semantic web for automated safety checks in subway construction. Dans: Automation in Construction, v. 141 (septembre 2022). (2022):
- (2022): Identifying Critical Influencing Factors of the Value Creation of Urban Rail Transit PPP Projects in China. Dans: Buildings, v. 12, n. 8 (31 juillet 2022).
- Seismic Soil Liquefaction Mitigation Using Stone Columns for Pile-supported Wharves. Dans: Journal of Earthquake Engineering, v. 26, n. 16 (janvier 2022). (2022):
- Developing a building information modeling–based performance management system for public–private partnerships. Dans: Engineering, Construction and Architectural Management, v. 27, n. 8 ( 2020). (2020):
- Effect of the combined action of lateral load and axial load on the pile instability in liquefiable soils. Dans: Engineering Structures, v. 205 (février 2020). (2020):
- Accident prevention through design (PtD): Integration of building information modeling and PtD knowledge base. Dans: Automation in Construction, v. 102 (juin 2019). (2019):