Qiming Li
- (2022): Research on Safety Resilience Evaluation Model of Data Center Physical Infrastructure: An ANP-Based Approach. Dans: Buildings, v. 12, n. 11 (27 octobre 2022).
- Probabilistic Classification Criterion for Failure Modes of Reinforced Concrete Columns. Dans: Journal of Earthquake Engineering, v. 27, n. 5 (février 2022). (2022):
- Research on Performance Measurement and Simulation of Civil Air Defense PPP Projects Using System Dynamics. Dans: Journal of Civil Engineering and Management, v. 27, n. 5 (27 mai 2021). (2021):
- Recent Advances in Modeling the Vulnerability of Transportation Networks. Dans: Journal of Infrastructure Systems, v. 21, n. 2 (juin 2015). (2015):
- Perception of Residual Value Risk in Public Private Partnership Projects: Critical Review. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 3 (mai 2015). (2015):
- Using Grounded Theory Methodology to Explore the Information of Precursors Based on Subway Construction Incidents. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 2 (mars 2015). (2015):
- Quantitative SWOT Analysis of Public Housing Delivery by Public–Private Partnerships in China Based on the Perspective of the Public Sector. Dans: Journal of Management in Engineering (ASCE), v. 28, n. 4 (octobre 2012). (2012):
- Performance Objectives Selection Model in Public-Private Partnership Projects Based on the Perspective of Stakeholders. Dans: Journal of Management in Engineering (ASCE), v. 26, n. 2 (avril 2010). (2010):
- Validating DFS concept in lifecycle subway projects in China based on incident case analysis and network analysis. Dans: Journal of Civil Engineering and Management, v. 24, n. 1 (mars 2018). (2018):
- Performance Objective-based Dynamic Adjustment Model To Balance the Stakeholders’ Satisfaction in Ppp Projects. Dans: Journal of Civil Engineering and Management, v. 21, n. 5 (mai 2015). (2015):
- Towards an autonomous real-time tracking system of near-miss accidents on construction sites. Dans: Automation in Construction, v. 19, n. 2 (mars 2010). (2010):
- Selection of performance objectives and key performance indicators in public–private partnership projects to achieve value for money. Dans: Construction Management and Economics, v. 27, n. 3 (mars 2009). (2009):