Jiulin Li
- Deep learning-based YOLO for crack segmentation and measurement in metro tunnels. Dans: Automation in Construction, v. 168 (décembre 2024). (2024):
- Study of Identification and Simulation of Ecological Zoning through Integration of Landscape Ecological Risk and Ecosystem Service Value. Dans: Sustainable Cities and Society, v. 107 (juillet 2024). (2024):
- Research on the revitalization of Huizhou traditional villages based on the PAF model. Dans: Journal of Asian Architecture and Building Engineering, v. 22, n. 6 (août 2023). (2023):
- (2023): Digital-Twin-Based High-Precision Assembly of a Steel Bridge Tower. Dans: Buildings, v. 13, n. 1 (13 janvier 2023).
- Evaluation of cracking in the shrinkage-compensating concrete with freeze–thaw resistance: from materials to structures. Dans: Materials and Structures, v. 55, n. 5 (juin 2022). (2022):
- An IPD-based incentive mechanism to eliminate change orders in construction projects in China. Dans: KSCE Journal of Civil Engineering, v. 21, n. 7 (mai 2017). (2017):
- A dedicated collaboration platform for Integrated Project Delivery. Dans: Automation in Construction, v. 86 (février 2018). (2018):
- Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 3 (mars 2009). (2009):