0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Yang, Kun / Bao, Yan / Li, Jiulin / Fan, Tingli / Tang, Chao (2024): Deep learning-based YOLO for crack segmentation and measurement in metro tunnels. Dans: Automation in Construction, v. 168 (décembre 2024).

    https://doi.org/10.1016/j.autcon.2024.105818

  2. Li, Jiulin / Hu, Dawei / Wang, Yongzheng / Chu, Jinlong / Yin, Haiwei / Ma, Ming (2024): Study of Identification and Simulation of Ecological Zoning through Integration of Landscape Ecological Risk and Ecosystem Service Value. Dans: Sustainable Cities and Society, v. 107 (juillet 2024).

    https://doi.org/10.1016/j.scs.2024.105442

  3. Li, Yao / Li, Jiulin / Chu, Jinlong (2023): Research on the revitalization of Huizhou traditional villages based on the PAF model. Dans: Journal of Asian Architecture and Building Engineering, v. 22, n. 6 (août 2023).

    https://doi.org/10.1080/13467581.2023.2182637

  4. Li, Jiulin / Li, Qingquan / Mao, Qingzhou / Xu, Hao (2023): Digital-Twin-Based High-Precision Assembly of a Steel Bridge Tower. Dans: Buildings, v. 13, n. 1 (13 janvier 2023).

    https://doi.org/10.3390/buildings13010257

  5. Li, Jiulin / Zhuang, Liangdong / Liu, Zhenguo / Wang, Dengquan (2022): Evaluation of cracking in the shrinkage-compensating concrete with freeze–thaw resistance: from materials to structures. Dans: Materials and Structures, v. 55, n. 5 (juin 2022).

    https://doi.org/10.1617/s11527-022-01982-0

  6. Ma, Jiankun / Ma, Zhiliang / Li, Jiulin (2017): An IPD-based incentive mechanism to eliminate change orders in construction projects in China. Dans: KSCE Journal of Civil Engineering, v. 21, n. 7 (mai 2017).

    https://doi.org/10.1007/s12205-017-0957-3

  7. Ma, Zhiliang / Zhang, Dongdong / Li, Jiulin (2018): A dedicated collaboration platform for Integrated Project Delivery. Dans: Automation in Construction, v. 86 (février 2018).

    https://doi.org/10.1016/j.autcon.2017.10.024

  8. Lu, Ming / Zhang, Yang / Zhang, Jianping / Hu, Zhenzhong / Li, Jiulin (2009): Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 3 (mars 2009).

    https://doi.org/10.1139/l08-145

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine