Arthur W. T. Leung
- A theoretical framework for classifying project complexity at the preconstruction stage using cluster analysis techniques. Dans: Engineering, Construction and Architectural Management, v. 29, n. 9 (août 2022). (2022):
- Comparative study of artificial neural networks and multiple regression analysis for predicting hoisting times of tower cranes. Dans: Building and Environment, v. 36, n. 4 (mai 2001). (2001):
- Nonlinear Models for Predicting Hoisting Times of Tower Cranes. Dans: Journal of Computing in Civil Engineering, v. 16, n. 1 (janvier 2002). (2002):
- Site Layout Planning using Nonstructural Fuzzy Decision Support System. Dans: Journal of Construction Engineering and Management, v. 128, n. 3 (juin 2002). (2002):
- Models for Assessing Hoisting Times of Tower Cranes. Dans: Journal of Construction Engineering and Management, v. 125, n. 6 (décembre 1999). (1999):
- Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. Dans: Construction Management and Economics, v. 17, n. 3 (mai 1999). (1999):