- A building sustainability assessment system (BSAS) for least developed countries: A case of Ethiopia. Dans: Sustainable Cities and Society, v. 87 (décembre 2022). (2022):
- (2022): Sustainability Performance of Green Building Rating Systems (GBRSs) in an Integration Model. Dans: Buildings, v. 12, n. 2 (18 janvier 2022).
- Using a Guiding Network to Determine Efficient Evacuation Routes in a Public Building. Dans: Journal of Infrastructure Systems, v. 19, n. 3 (septembre 2013). (2013):
- An estimation model of construction project segmentation for optimum project pricing. Dans: Engineering, Construction and Architectural Management, v. 28, n. 9 (mars 2021). (2021):
- Integrating value estimation and simulation for contractor selection. Dans: Automation in Construction, v. 119 (novembre 2020). (2020):
- Laying out the occupant flows in public buildings for operating efficiency. Dans: Building and Environment, v. 51 (mai 2012). (2012):
- Developing As-built BIM Model Process Management System for General Contractors: A Case Study. Dans: Journal of Civil Engineering and Management, v. 22, n. 5 (mai 2016). (2016):
- Planning Work Crew Assignments for Pedestrian Area Renovation To Improve Its Impact on the Public. Dans: Journal of Civil Engineering and Management, v. 20, n. 3 (juin 2014). (2014):
- Integrating Simulation and Ant Colony Optimization to Improve the Service Facility Layout in a Station. Dans: Journal of Computing in Civil Engineering, v. 26, n. 2 (mars 2012). (2012):
- Critiquing contractors' scheduling by integrating rule-based and case-based reasoning. Dans: Automation in Construction, v. 13, n. 5 (septembre 2004). (2004):
- Optimizing schedule for improving the traffic impact of work zone on roads. Dans: Automation in Construction, v. 18, n. 8 (décembre 2009). (2009):
- Renovation scheduling to minimize user impact of a building that remains in operation. Dans: Automation in Construction, v. 22 (mars 2012). (2012):
- Developing project communities of practice-based knowledge management system in construction. Dans: Automation in Construction, v. 22 (mars 2012). (2012):
- An integrated model for planning development projects using ACO and construction simulation. Dans: Civil Engineering and Environmental Systems, v. 28, n. 4 (décembre 2011). (2011):
- Use of Support Vector Regression to Improve Computational Efficiency of Stochastic Time-Cost Trade-Off. Dans: Journal of Construction Engineering and Management, v. 140, n. 1 (janvier 2014). (2014):