Luka Lazarević
- Determination of temperature stresses in CWR based on measured rail surface temperatures. Dans: Construction and Building Materials, v. 284 (mai 2021). (2021):
- Application of seismic tomography for assessment of the railway substructure condition. Dans: Structural Health Monitoring, v. 18, n. 3 (mars 2018). (2018):