K. C. Lam
- Feng Shui and Its Impacts on Land and Property Developments. Dans: Journal of Urban Planning and Development, v. 125, n. 4 (décembre 1999). (1999):
- Decision support system for contractor pre‐qualification—artificial neural network model. Dans: Engineering, Construction and Architectural Management, v. 7, n. 3 (mars 2000). (2000):
- Using an adaptive genetic algorithm to improve construction finance decisions. Dans: Engineering, Construction and Architectural Management, v. 8, n. 1 (janvier 2001). (2001):
- Multi‐project cash flow optimization: non‐inferior solution through neuro‐multiobjective algorithm. Dans: Engineering, Construction and Architectural Management, v. 8, n. 2 (février 2001). (2001):
- A new laboratory apparatus for studying dynamic compaction grouting into granular soils. Dans: Soils and Foundations, v. 53, n. 3 (juin 2013). (2013):
- Effect of Lateral Earth Pressure Coefficient on Pressure Controlled Compaction Grouting in Triaxial Condition. Dans: Soils and Foundations, v. 50, n. 3 (juin 2010). (2010):
- Development of a Quantitative Roof Maintenance Management Model. Dans: International Journal of Architecture Engineering and Construction, v. 4, n. 3 (septembre 2015). (2015):
- Construction project control under resources constraints by fuzzy linear programming. An application of fuzzy linear programming using professional knowledge to provide extra resources for civil works. Dans: Building Research & Information, v. 22, n. 6 ( 1994). (1994):
- Active Vibration Control of an Aircraft Cabin Panel Using Piezoelectric Sensors and Actuators. Dans: International Journal of Structural Stability and Dynamics, v. 3, n. 1 (mars 2003). (2003):
- Capital Budgeting Evaluation Practices of Building Contractors in Hong Kong. Dans: Australasian Journal of Construction Economics and Building, v. 2, n. 1 (novembre 2002). (2002):
- Entropy Application to Improve Construction Finance Decisions. Dans: Journal of Construction Engineering and Management, v. 132, n. 10 (octobre 2006). (2006):
- A Decision Support System for the determination of concession period length in transportation project under BOT contract. Dans: Automation in Construction, v. 31 (mai 2013). (2013):
- A multiple kernel learning-based decision support model for contractor pre-qualification. Dans: Automation in Construction, v. 20, n. 5 (août 2011). (2011):
- Capital budget planning practices of building contractors in Hong Kong. Dans: Construction Management and Economics, v. 19, n. 6 (octobre 2001). (2001):
- An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. Dans: Construction Management and Economics, v. 19, n. 1 (janvier 2001). (2001):
- Using the principal component analysis method as a tool in contractor pre‐qualification. Dans: Construction Management and Economics, v. 23, n. 7 (septembre 2005). (2005):
- Application of the entropy technique and genetic algorithms to construction site layout planning of medium‐size projects. Dans: Construction Management and Economics, v. 23, n. 2 (février 2005). (2005):
- Selection of funding schemes by a borrowing decision model: a Hong Kong case study. Dans: Construction Management and Economics, v. 24, n. 4 (avril 2006). (2006):
- A fuzzy neural network approach for contractor prequalification. Dans: Construction Management and Economics, v. 19, n. 2 (mars 2001). (2001):